|


| |
|
Nortex was awarded the turnkey construction of a 3,400 square foot medical
facility for the US Army at West Fort Hood, on a fast-track basis in August,
2002. The project featured a poured-in-place concrete foundation,
fibre-cement subfloor, 9' interior ceiling height, exam rooms, offices, handicap
restrooms, a connector to the existing building, treated wood ramps and steps
and a steel exterior siding. The project was completed in January of 2003.

 
|
|